Tuesday, October 21, 2008

Blood In Stool, Lump On Testicles

New track, new possibilities

Finally
  • operating the 3,000 m. track 23, the ILS and approach lighting.
  • Iberia is considering using the Airport as an alternative León diverted or canceled flights in Asturias.
  • The company calls for a streamlining of the improved facilities on land. Later
soon have finally been published charts in the AIP of AENA, which collected and the location of the ILS, relocate the head 23 and show the new approach lighting system. However, these cards are still not reliable. In summary, the main error is the existence of the runway 09/24. This disappeared as a result of deforestation carried out to fill the valley in which sits the extension of the runway 23. Now that there is a hole of around 3-7 m. depth where they form small gaps in the rain. Also from here, and although it can be seen as a mistake, remember all the Approach Lighting System Cat.I of 900 m. axis is with jimmies (single) , although this is represented as a key shaft with distance (Calvert).


Meanwhile, Iberia has been communicated to the Chambers of Commerce of Asturias and Leon, his intention to start using the airport as an alternative to Leon de Aviles to cancellations and diversions of the company, due to closer this to the Principality. However, the general director of the company has stressed that will be required in the terminal Leon's "infrastructure, equipment and personnel to meet the aircraft and passengers that could be diverted to the same", so that the implementation of this measure will not be immediate.

Meanwhile, AENA will ensure that the works of the New Terminal Area are in progress, pending Environmental Impact Statement to proceed to award the project.
With

Friday, October 10, 2008

What Does Swallen Ankle Mean ?

New stage, new image

company Embraer Leon on the platform of La Virgen del Camino, it seems that pessimism takes hold of all those who want the best for Leon, and in particular to the airport. The feeling that we have done something wrong, or the inability to explain why if we believe it has become right, lock our conversations and discussions as seen lately.

Given all this, some believe that the best thing is to work actively on improving our airport, ever since our modest current position. So I decided to improve as much as possible this space, keep up to date with little free time I have, and thereby to learn more this vital infrastructure for our region have a future.

So stop talking about Laguna. Not that he has passed. Not that did not exist. Has simply not going to solve nothing. So we had to do was done or not, but what is clear is every time we lose now regret not going to serve anything. We will remember everything you want and stuff, but do not spend much energy on it, is needed for other things.

I know it is less attractive and therefore more difficult to see, but more importantly
  1. there is still no well-established service bus to the airport.
  2. The works of the terminal and platform would begin this summer as the airport director, Rafael Escobar, and the truth is still present during opening of tenders as recruitment page AENA.
I repeat. Until there is an efficient public transport service to the airport, intermodality is zero. Nothing. And I can assure that the airport is vital to integrate the transportation system if we want it to work. I firmly believe that a bus line Airport - Renfe / Bus Station - Sto. Domingo, for example, is vital to make things work.

And what about the new terminal , and more importantly, the new platform . It is clear that Leo need decent facilities right now. Being a regional airport is not opposed to giving quality service. And it is also essential in order to aspire to European flights.

is important that everyone contributed their bit. That outsiders do not believe it, but also do not believe us when everything points to good prospects (and not me, but aeronautical engineers with experience considered key figures in the world of air transport ...). A grain can be, for example, really believe as a lion in this infrastructure. Or write a letter to the mayor to remind you that we no bus or create this blog.

The Leon in exile, like myself, we are also fighting for what we feel is ours. In this sense, a fellow club in Madrid is preparing a thesis for EU neighbor of Aeronautical Engineering (UPM) on the airport of Leon. As part of that, you need to develop databases and to-face surveys to help you find some data on demand. If you have a couple of minutes, well it would help doing it and spreading it as far as your chances between people of Leon:


hope not bore you much with this post may be too earth shattering, but I see it necessary.

Greetings to all. Victor.

Thursday, October 9, 2008

Haloween Baby Shower Menu

Note Lagunair ticketed passengers will fly

By agreement of the Board of Laguna held on October 6 last
in Leon was decreed
temporary suspension of commercial operations scheduled for the company,
from 00:00 pm Thursday 9th October. In this situation

Lagunair to ensure service to its passengers
entered into a Special Agreement Reprotección,
under which it is reported that all passengers ticketed by
Lagunair N7 before October 9, 2008, will
transported to their destinations by Air Nostrum
without imposing any additional cost to passengers, under the conditions laid down in
their tickets.

agents may display flights in the PNR and reprotección
if you need any clarification in this respect should contact
Serviagencias IBERIA Company.
also ensures the operational Lagunair all
lines to the aforementioned date and also guarantees the repayment of all tickets purchased for travel
later dates
provided when appropriate under the terms of fare.

For further information and to confirm flight schedules please contact
recommend Serviberia / Serviagencias in

807 902 400 500
123 456

Sincerely, Sales Management

PLACER

Monday, October 6, 2008

Milena Velba Chevrulet

Lagunair Thursday, 9 Days scrambled

This was decided today by the Governing Body of the airline Leon after meeting this afternoon, and this has been shown in a press release to media. The memo reports that the company inform the DGCA the temporary suspension of all scheduled commercial operations from 00.00 am local time on Thursday, October 9, 2008 .


Reasons that led to this point were, first, the indecision of Box Spain at the time to participate in the capital, and lack of interest by the company Board of Leon, who has never shown a proactive behavior towards the continuity of Lagunair, tightening only to statements that certainly do not correspond with reality. And all this despite the Globalia group has again reiterated its intention to endorse the new plans of the company with the sole condition that the Board is involved.

is unfortunate that the lack of good work by all which have the capacity to act (not will) has led to this cessation of operations that should not have occurred.

Thursday, October 2, 2008

Side Effect Of St Dalfour